This Document is being sent on behalf of R. Scott Christie, P.E., Deputy Secretary for Highway Administration
Good Afternoon,
This e-mail is intended to replace the e-mail sent by Lorraine Bennett on September 29, 2009 at 4:29 p.m. The Bureau of Construction and Materials (BOCM) attempted to recall the September 29, 2009 e-mail, but some may not have been able to be recalled. If you actually received Lorraine Bennett’s September 29, 2009 e-mail, please delete it and replace it with this e-mail.
There are typographical corrections to the attached 2010 NECEPT Bituminous Technician Certification Program Course Information packet being sent with this e-mail.
Please Note: NECEPT will begin to accept online registrations and hardcopy registrations starting on Thursday, October 15, 2009. Until that time, the online registration system will not be available.
If you have any questions, please contact either Timothy L. Ramirez, P.E. in the Bureau of Construction and Materials at (717) 783-6602 or contact NECEPT at (814) 863-1293.
2010 PADOT-NECEPT Announcement
Attachment 2010 PENNDOT-NECEPT Bituminous Technician Cert Prgm Course Info Packet
Until then, the Audit Guide is available on AASHTO’s Web site in draft form here.
This message is being sent on behalf of Daryl R. St. Clair, P.E., Acting Director for the Bureau of Highway Safety and Traffic Engineering (BHSTE).
Clearance Transmittal Right-of-way Procedures for HOP
SOL Memo RW Policy updated 01 20 10
A-1-RW procedures for HOPs 1-21-2010
A-2-Pub 170 Chapter 8.1 M950 D1 01 21 10
A3-Pub 170 Chapter 8.1 M950 D2 01 21 10
A-4-Pub 170-Outline of RW Procedures for HOPs 1 21 2010
B-1-Pub 282 RW procedures for HOPs 01 25 10
B-2-Pub 282 Chapter 8.1 M950 D1 01 25 10
B-3-Pub 282 Chapter 8.1 M950 D2 01 25 10
B-4-Pub 282 Outline of RW Procedures for HOPs 01 25 10
C-1-M950 D1 modified interactive
C-2-M950 D2 modified interactive 1 20 2010



